Sewerage project for St Mary’s Bay

Sewage contamination at St Mary’s Bay and at Masefield beach is likely to be reduced significantly by a project to improve water quality. The proposed work is expected to prevent most of the overflows of mixed sewage and stormwater from the ageing combined pipe infrastructure in these areas.

The number of overflows at St Mary’s Bay will be reduced from around 70 per year, to around 2-4 per year, and at Masefield beach from around 70 per year to zero, according to Auckland Council.

New infrastructure will create greater holding capacity so that when the existing combined pipes network reaches capacity during heavy rain, the mixed stormwater/sewage can be retained and released to the Mangere treatment plant at a later date. Mixed stormwater/sewage may still have to be released (if the inflow exceeds the holding capacity of the new infrastructure), but in those (hopefully rare) occasions, it will be discharged via a new pipe which will run from near Masefield beach and continue further out into the harbour than the existing shorter broken pipe. 

There’s still time to have your say on this project. Final plans will be available for public consultation, probably in December. Residents will be notified. Council will then apply for resource consent and the project is expected to begin in early 2018.

St Mary’s Bay Association chair, David Abbott, comments:
“This appears to be a step in the right direction, after years of SMBA pressing for action on the pollution in St Mary’s Bay/Westhaven marina. It is proposed as a short to medium term measure until the old drainage infrastructure in the central Auckland isthmus is upgraded – hopefully by separating stormwater and sewage entirely. The proposal is still short of detail on the ability of the extended pipe to carry the overflow water away from inner harbour beaches. We will want to be satisfied that this is not just moving the problem to another community’s patch. ”

The project is being managed by Auckland Council’s Healthy Waters group in conjunction with Watercare and Panuku. For further information, including diagrams, and questions asked at a public consultation in June please click on:

http://www.westhaven.co.nz/getmedia/2d5caa3e-0f9a-4d3c-9a13-99979cf1bb8a/Overview-for-website-July-10.pdf/

http://www.westhaven.co.nz/getmedia/9157a6d9-4eda-44f7-a9ab-13d77b900cc9/Frequently-Asked-Questions.pdf/

See also “Sewage Contaminating Waitemata Harbour” article outlining the need for a major upgrade of the old and failing sewerage system throughout Auckland, plus an explanation of the combined pipe system. Click here to read  “Sewage Contaminating Waitemata Harbour”.